Detail

TCG supply piping system for Quang Hanh Osen project

Sungroup, The developer of Quang Hanh Hot Spring Project was approved TCG proposal for piping system. TCG responsible for supplying product, training for MEP contractor to make the sucess project. Our solution focus on hot spring peformance , reduce the heat loss for the long runing pipe. Save the cost for the maintaining, long life cycle better than Stainless steel. Thanks for CPVC 4120

Hot spring project / Piping system : start July 2019

 

Chat Zalo Call Now Request Call Back Chat Now Advise now